How Long Does a Kitchen Remodel Take?

When considering a kitchen remodel, one of the first questions homeowners ask is: “How long will this take?” For families who love to cook, entertain, and showcase their homes, the kitchen is the heart of daily life. At Southern Heritage Custom Construction, we know that a remodel isn’t just about improving functionality; it’s about elevating your lifestyle and creating a space that reflects your personal taste and the quality of your home.

The Average Timeline

While every remodel is unique, most full kitchen remodels in Colorado Springs take between 8 to 16 weeks from demolition to the final finishing touches. The exact timeline depends on the scope of your project, the level of customization, and the materials you choose. High-end homes, with custom cabinetry, premium finishes, or integrated technology, often require a longer schedule, but the results are worth it.

Here’s a general breakdown of what you can expect:

  • Planning & Design (2–6 Weeks)
  • This is where vision meets expertise. At Southern Heritage, we provide design and budget services up front, so you know what’s possible and what to expect before construction begins. During this phase, we refine layouts, select finishes, and align the design with your lifestyle.
  • Permits & Ordering Materials (2–4 Weeks)
  • Colorado Springs requires permits for structural, plumbing, and electrical work. Our team manages this process to keep your project on track. Custom cabinetry, stone countertops, or imported finishes may extend this stage if lead times are longer.
  • Demolition & Structural Work (1–2 Weeks)
  • Once materials are ready, the existing kitchen is carefully removed. If your remodel includes structural updates, such as removing walls for an open-concept layout, this stage will take additional time.
  • Mechanical Systems & Rough-Ins (1–2 Weeks)
  • This includes plumbing, electrical, and HVAC updates. For high-end kitchens, smart home features, advanced lighting, or specialty appliances may extend this step slightly.
  • Cabinetry, Flooring & Surfaces (3–6 Weeks)
  • Custom cabinetry and countertops are often the centerpiece of a luxury kitchen remodel. Installation times vary depending on complexity, but these features are worth the craftsmanship.
  • Finishing Touches (1–2 Weeks)
  • Backsplashes, trim, fixtures, and final paint bring everything together. At SHCC, we ensure no detail is overlooked, because it’s the small details that make a home stand out.

Living in a Construction Zone

One of the most important, but often overlooked, aspects of a remodel is understanding what day-to-day life will look like. Even with careful planning and experienced professionals, a kitchen remodel creates disruption.

  • Noise and Dust: Demolition, installation, and construction activities can be loud and dusty. At Southern Heritage, we take measures to minimize dust migration and keep your home as livable as possible during the process.
  • Temporary Kitchen Setup: Many families set up a temporary kitchen in another room using essentials like a microwave, toaster oven, or outdoor grill. This makes it easier to maintain routines while your main kitchen is under construction.
  • Lifestyle Adjustments: For households that enjoy frequent entertaining or cooking together, expect some changes in your daily rhythm until the new kitchen is complete.

Managing Cleaning and the Mess

Even with the best dust barriers, protective coverings, and daily clean-up routines, remodeling does create a mess. At Southern Heritage, we believe in being transparent about this reality.

  • We take proactive steps to control dust, keep pathways clear, and respect your home throughout the construction process.
  • However, we recommend scheduling a post-construction cleaning service once work is complete. At a minimum, a professional wipe-down ensures that your new kitchen shines the way it should.
  • For clients who want a true “move-in ready” feel, a full deep cleaning service after remodel completion is often the best solution.

Factors That Influence Your Timeline

  • Level of Customization: Custom millwork, designer finishes, and specialty features require more time than off-the-shelf solutions.
  • Home Age: Older homes may need electrical or structural updates that extend the schedule.
  • Material Availability: Imported stone or unique fixtures can add weeks if supply chains are delayed.

At Southern Heritage, we believe the best kitchens are built with patience, care, and craftsmanship. Our goal is to create spaces that not only serve your family today, but also become the backdrop for your gatherings, celebrations, and stories for years to come.